Font size
Background and font color
Images
Text scoring
Regular version of the site
Alton
Flexible Endoscopy Instruments
+77775370124
+77775370124
Email
info@alton.kz
The address
8 Beibitshilik Street, Astana, Ramada Hotel
Catalog
  • Biopsy Forceps
    • Disposable Biopsy Forceps
    • Reusable Biopsy Forceps
  • Clip Applicators (HemoClip)
    • Disposable HemoClip
  • Disposable Measuring Ruler
  • EMR Instruments
    • Disposable EMR Instruments
  • ERCP Instruments
    • Disposable ERCP Instruments
  • ESD Instruments
    • Electrosurgical forceps
    • ESD Knife
Company
  • Company
  • History
  • Licenses
  • Partners
  • Brands
  • Staff
  • Reviews
  • Vacancy
  • Requisites
  • Documents
News
Contacts
Astana
en
ru
en
0
Alton
Flexible Endoscopy Instruments
  • Company
  • Faq
  • ...
    Astana
    +77775370124
    +77775370124
    Email
    info@alton.kz
    The address
    8 Beibitshilik Street, Astana, Ramada Hotel
    en
    ru
    en
    Catalog
    • Biopsy Forceps
      Biopsy Forceps
      • Disposable Biopsy Forceps
      • Reusable Biopsy Forceps
    • Clip Applicators (HemoClip)
      Clip Applicators (HemoClip)
      • Disposable HemoClip
    • Disposable Measuring Ruler
      Disposable Measuring Ruler
    • EMR Instruments
      EMR Instruments
      • Disposable EMR Instruments
    • ERCP Instruments
      ERCP Instruments
      • Disposable ERCP Instruments
    • ESD Instruments
      ESD Instruments
      • Electrosurgical forceps
      • ESD Knife
    Company
    • Company
    • History
    • Licenses
    • Partners
    • Brands
    • Staff
    • Reviews
    • Vacancy
    • Requisites
    • Documents
    News
    Contacts
      0
      Alton
      Catalog
      • Biopsy Forceps
        Biopsy Forceps
        • Disposable Biopsy Forceps
        • Reusable Biopsy Forceps
      • Clip Applicators (HemoClip)
        Clip Applicators (HemoClip)
        • Disposable HemoClip
      • Disposable Measuring Ruler
        Disposable Measuring Ruler
      • EMR Instruments
        EMR Instruments
        • Disposable EMR Instruments
      • ERCP Instruments
        ERCP Instruments
        • Disposable ERCP Instruments
      • ESD Instruments
        ESD Instruments
        • Electrosurgical forceps
        • ESD Knife
      Company
      • Company
      • History
      • Licenses
      • Partners
      • Brands
      • Staff
      • Reviews
      • Vacancy
      • Requisites
      • Documents
      News
      Contacts
        en
        ru
        Astana
        +77775370124
        Email
        info@alton.kz
        The address
        8 Beibitshilik Street, Astana, Ramada Hotel
        0
        Alton
        Telephones
        +77775370124
        Email
        info@alton.kz
        The address
        8 Beibitshilik Street, Astana, Ramada Hotel
        0
        Alton
        • Catalog
          • Catalog
          • Biopsy Forceps
            • Biopsy Forceps
            • Disposable Biopsy Forceps
            • Reusable Biopsy Forceps
          • Clip Applicators (HemoClip)
            • Clip Applicators (HemoClip)
            • Disposable HemoClip
          • Disposable Measuring Ruler
          • EMR Instruments
            • EMR Instruments
            • Disposable EMR Instruments
          • ERCP Instruments
            • ERCP Instruments
            • Disposable ERCP Instruments
          • ESD Instruments
            • ESD Instruments
            • Electrosurgical forceps
            • ESD Knife
        • Company
          • Company
          • Company
          • History
          • Licenses
          • Partners
          • Brands
          • Staff
          • Reviews
          • Vacancy
          • Requisites
          • Documents
        • News
        • Contacts
        • en
          • Language
          • en
          • ru
        • Astana
          • Cities
          • Astana
        • Cabinet
        • 0 Cart
        • +77775370124
          • Telephones
          • +77775370124
        • 8 Beibitshilik Street, Astana, Ramada Hotel
        • info@alton.kz

        Air purification system for the confectionery factory "Slada"

        Home
        —
        Projects
        —
        Ventilation systems
        —Air purification system for the confectionery factory "Slada"
        08.12.2020
        Provided staff with clean air throughout the entire work shift
        Field of activity
        Food industry
        Website
        aspro.ru
        Author
        Galina Bronina
        Order project
        Ask a Question
        Individual approach The personal manager assigned to you
        Since 2005 We develop innovative solutions for endoscopy
        72 countries In which our products have proven themselves
        • Description
        • Video
        • Documents
        • Reviews
        • Additionally

        In any industrial enterprise, when processing any product, a large volume of foreign particles is emitted into the air. They settle in the lungs of employees and lead to respiratory illness. The air purification system is designed to solve this problem throughout the entire work shift.

        Prerequisites

        The managers of the Slada factory turned to Allcorp3 after the employees of the confectionery shop were regularly absent from the workplace due to illness. Colds, pneumonia and pneumonia plagued all the workers, and the production did not meet its monthly plans. Realizing that the reason lies in air pollution, the representatives of the factory immediately began to design a cleaning system together with Allcorp3.

        Stages of work

        1. Our employees conducted several independent examinations to find out what impurities are in the air and how high the level of pollution is. A competent approach to project creation helps to increase the efficiency of the cleaning system and to choose the right equipment.
        2. The installation of the system was quite laborious, as it was necessary to comply with certain requirements in order not to disrupt the production process. In 8 days, an insulated air duct system with diffusers appeared under the ceiling, ventilators were placed on the walls, and air supply units were placed in the corners of the room. The air purifiers were placed in three points of the workshop - next to places of high concentration of impurities.
        3. System testing took 4 days. During this time, the level of air pollution has decreased by 3 times. By the end of the fourth day, we noticed a decrease in the efficiency of the system. It turned out that the filters of the air cleaners were clogged, although they usually last for a month of uninterrupted operation. The filters were replaced, and our specialists instructed the head of the workshop on how to take care of the equipment.

        Result

        The first positive reviews were erupted by the employees: according to them, it became easier to breathe, and they began to leave the workshop less often for fresh air. And after a month of work, all employees were at their workplaces - the illnesses receded, and nothing prevented effective work. This became a kind of motivation for the employees: they realized that the management would care about them, so the next monthly plan was fulfilled by 110%.

        Video
        Documents
        c8f6bf7cc4bb0027f32c0238a649eb18
        7 byte
        04fd0208c41ae9b51cad7b299f794ba1
        18 byte
        508c27c6fc10dd7cecbf4f2fb20c55f7
        15,4 KB
        Reviews
        Director of the gymnasium number 56—15.10.2020
        Boris Kronkart

        I was afraid that a commercial organization would not do the job well, because projects in budgetary institutions are not very large and not as valuable as in large enterprises. I didn't even think that Allcorp3 would take up ...

        An additional tab for posting information about projects, delivery or any other important content. It will help you answer the buyer's questions and dispel his doubts about the purchase. Use it as you see fit.

        You can remove it or return it back by changing one checkbox in the component settings. Very comfortably.

        Photo gallery
        2 —
        1/2 —
        Air purification system for the confectionery factory "Slada"
        Air purification system for the confectionery factory "Slada"
        Air purification system for the confectionery factory "Slada"
        Air purification system for the confectionery factory "Slada"
        Sales
        Until October 30, 2025
        10% discount on the implementation of engineering systems
        Celebrating Engineer's Day! We give a discount for the code word - ENGINEER. Free check-out without an appointment and prepayment.
        Services
        Ventilation
        The correct ventilation system ensures a comfortable life and work. Allcorp3 engineers design and install ventilation systems in buildings of various types: industrial, office, food, etc.
        Network engineering
        Engineering networks provide us with clean water, fresh air, light and warmth. Provide comfortable use of industrial and residential buildings. Allcorp3 designs, selects materials and equipment, and then builds engineering networks for structures of any purpose. We also coordinate and draw up documentation.
        30 000 ₽
        Similar projects
        Ventilation systems
        Ventilation system for the SEC "Solnyshko"

        SEC "Solnyshko" was built on August 25, 2017. The structure assumes high traffic during rush hour and average traffic during the rest of the working time. Due to the unusual shape of the mall, a specially shaped duct system was required to provide aeration throughout the building without stagnation.


        Staffs
        Commercial director
        Mark Fisher
        Write a message
        Phone number
        +7 (000) 000-00-00
        E-mail
        commerce@site.ru
        Supervises the financial and economic activities of the enterprise.
        Back to the list
        Catalog
        Company
        Info
        Contacts
        en
        ru
        en
        +77775370124
        +77775370124
        Email
        info@alton.kz
        The address
        8 Beibitshilik Street, Astana, Ramada Hotel
        info@alton.kz
        8 Beibitshilik Street, Astana, Ramada Hotel
        © 2026 Aspro: Corporate Website 3.0
        Privacy Policy
        0 Cart
        Your cart is empty
        It is easy to fix it: select the product you are interested in in the catalog and click the "Add to cart" button
        To catalog
        Произвольный виджет
        Homepage Personal area 0 Cart Catalog Sales Contacts Servises Brands News Employees Reviews Partners Career FAQ Company Projects Licenses Documents Requisites Blog Landings Rates Gallery Price